AUTOMATED PRESSURE TUBE EXTRACTION FOR THE NUCLEAR REACTOR OF THE BRENNILIS POWER PLANT
The aim of the FETCH project was to initiate the design of an automatic robot architecture for use in nuclear decommissioning.
The methodology developed will be applied to the development of a mobile robot for cutting and transporting pressure tubes.
Project Achievements
- Setting up a simulator to identify feasible extraction trajectories
- Identification of extraction paths compatible with environmental constraints
- Implementation of a robotic architecture to perform extraction
- Installation of the visual servoing system to extract the pressure tubes automatically
- Validation thanks to a scale-down mock-up
Technical and economic impacts
Automation of tasks currently performed by remote operation
Increased pressure tube extraction rate
Applications & industrial perspectives
The technological and methodological building blocks developed in this project open up interesting prospects for the nuclear sector, for the automation of additional tasks, and for reuse of dismantling resources for future worksites. Through this project, IRT Jules Verne was able to provide a solution to an industrial problem in a sector of activity in which it was a newcomer, and the methodology put in place for this project may be used again in the future for other industrial applications.
Partners
- IRT JULES VERNE,
- EDF – Département DP2D,
- GRAPHITECH,
- CNRS – LS2N